Entertainment & Large Venues
The Load Changes With the Event
Lighting, HVAC, concessions, kitchens, production systems and back-of-house equipment can create short-duration peaks that differ significantly from non-event operation. HECSY measures those patterns before recommending controls or capital projects.
Typical Challenges
Large event-day demand peaks
Complex startup and shutdown schedules
Critical event and life-safety operations
Limited opportunities for power shutdowns
Multiple electrical rooms and legacy systems
Generator and emergency-power coordination
Need for clear financial and operational reporting
HECSY Capabilities
Main-service and submetering
Event-day load profiling
BMS and equipment-sequence review
Demand and power-factor analysis
Battery storage and peak-management feasibility
Generator and switchgear integration
Non-disruptive installation planning where feasible
Real-time dashboards and alerts