Microgrid and Zero-Export Controls
MICROGRID & ZERO-EXPORT CONTROLS
Complete Facility Control.
On Your Terms.
INTEGRATE. CONTROL. COMPLY. CREATE OPPORTUNITY.
HECSYsmart® coordinates solar, battery storage, generators and facility loads in one intelligent platform. Zero-export when required. Flexible grid interaction when allowed. Always built around your operational, utility and financial objectives.
RESILIENCE
ZERO EXPORT
PEAK SHAVING
ENERGY OPTIMIZATION
GRID PARTICIPATION
MPLETE MICROGRID INTEGRATION
Start With the
Operating Objective
Microgrid projects often begin with a list of equipment before the facility's actua operating need is understood. HECSY starts with interval data, utility and interconnection requirements, critical loads, existing gene3dtion and storage, electrical constraints, resilience requirements and the customer's financial priorities.
The microgrid is then designed around one or more operating objectives, zero export, resi ience, demand control, energy optimization and grid partic pation, rather than around a generic equipment package.
COMPLETE INTEGRATION SCOРЕ
More Than a Controller.
A Fully Integrated Energy System.
HECSY designs the operating architecture that connects facility loads, generation, storage, switchgear, utility requirements and control logic into one coordinated system. The objective is not simply to make individual assets communicate. It is to make the entire facility respond intelligently as operating conditions change.
Facility load and operating analysis
Understand critical loads, operating schedules, demand behavior and available flexibility.
Zero export and grid interaction logic
Maintain required export limits while preserving intelligent response to utility and market conditions.
One line diagrams and electrical engineering
Develop the electrical architecture, interconnection points and operating sequences for coordinated control.
Switchgear and protection coordination
Integrate breakers, transfer equipment, relays and protective devices
with the microgrid operating strategy.
Utility and AHJ coordination
Support interconnection reviews, operating requirements, studies and approval processes.
HECSYsmart® EMS programming and dispatch logic
Coordinate charging, generation, facility loads and grid interaction
according to defined priorities.
Solar, wind and distributed generation coordination
Incorporate onsite generation into the facility strategy rather thanallowing each asset to operate independently.
Battery and PCS integration
Coordinate storage with facility demand, generation, reserve
requirements and grid conditions.
Generator sequencing and control
Coordinate generator availability, loading and operating sequences
with other microgrid resources.
Thermal energy and controllable load integration
Use thermal storage and appropriate facility loads as additional
flexible energy resources.
Commissioning, training and performance review
Validate sequences, train operators and review performance as
facility conditions change.
Ongoing optimization and grid-readiness
Refine strategy as tariffs, equipment, facility loads and grid
opportunities evolve.
ONE FACILITY. MULTIPLE ENERGY ASSETS. ONE OPERATING STRATEGY.
BUSINESS VALUE THROUGH MICROGRID CONTROL
Beyond Equipment.
Built Around
Operational & Business Value.
2A microgrid is not simply a battery, generator, solar array and controller connected together. HECSY combines real facility data, electrical engineering, automation, utility requirements and business strategy to determine how those assets should operate together and what they should accomplish for the facility
That may mean maintaining zero export, protecting critical operations, reducing peak demand, maximizing onsite generation, improving resilience or positioning available capacity for future grid participation
HECSY does not begin with equipment. We begin with the operating and financial outcome.